Before upgrading
Record the running artifact digest, source revision, runtime version and configuration names. Confirm the release’s required browser version, storage schema, portal adapter and API contract. Verify secrets are provisioned through the approved secret store. Keep production and staging credentials separate. Confirm the report-retention policy and snapshot only the data required by the recovery plan. Reject a promotion that lacks workspace authorization, credential containment or a tested workflow. The repository’s placeholder test command is not sufficient release evidence.Staging verification
Use a synthetic device and test recipient. Submit a report, poll the job, inspect its PDF and verify provider acceptance of the email. Check negative temperatures, threshold boundaries, missing measurements and a quoted CSV field. Run concurrent jobs and confirm file, workspace and report isolation. Test invalid credentials, restricted recipients, dependency failures, cancellation and expiry. Confirm retrying an accepted request with the same idempotency key does not duplicate work or email.Production promotion
- Record the release owner and the immutable artifact to promote.
- Apply additive configuration and storage changes before switching traffic.
- Drain or preserve in-flight jobs under the compatible worker version.
- Promote the verified artifact using the deployment procedure for the actual hosting environment.
- Run a controlled production smoke check with an approved device and recipient.
- Review job failures, delivery outcomes, authorization failures and cleanup backlog.
- Record the promotion result and the verified rollback artifact.